Know the real condition
Measured results across every circuit tell you the actual state of the installation instead of an assumption based on the age of the board.
Derby · EICR, PAT testing and fault finding
Condition reports, PAT testing and fault finding, carried out by a NAPIT Full Scope contractor. We explain the findings so you know what's urgent, what's advisory and what can wait.
NAPIT Full Scope registered · £10m public liability and £1m professional indemnity · Reports explained in person
16+ years
Domestic, commercial and industrial experience
Full Scope
NAPIT registered for all aspects of electrical work
6-year
NAPIT-backed workmanship guarantee on qualifying installs
£10m
Public and employers' liability cover
Free
Initial consultation, no obligation
The service
An Electrical Installation Condition Report is a structured inspection and test of a fixed electrical installation: the consumer unit, earthing and bonding, every circuit, and a sample of accessories. It produces a Satisfactory or Unsatisfactory outcome and a list of coded observations describing what was found and how serious each item is.
The codes are what matter. C1 means danger present, and it needs immediate action. C2 means potentially dangerous, and it needs remedial work. C3 is an improvement recommendation and doesn't make a report unsatisfactory on its own. FI means further investigation is required. Plenty of people get a report full of C3 items and assume the worst. Plenty of others miss a single C2 buried in a long list.
We also carry out PAT testing on portable appliances for offices, rental properties and commercial premises, and fault finding where something's tripping, dimming or failing on and off and nobody's got to the bottom of it. Either way, you get a clear report and a conversation about what it actually means for you.
What it costs to leave it
Electrical deterioration happens where you can't see it. Insulation resistance falling on a circuit under a floor. A loose connection heating a terminal inside a socket. An earth path compromised years ago by plumbing work carried out by someone who didn't consider it. None of these announce themselves until they cause a trip, a fire or a shock.
For landlords the consequences are legal as well as financial. Rented properties in England need a satisfactory EICR at least every five years, with copies given to tenants and the local authority on request. Non-compliance carries penalties, and an unsatisfactory report found mid-tenancy has to be fixed to a deadline.
The other common cost is delay. Buyers pull out or renegotiate when an installation gets flagged late in a sale. Insurers ask about condition after an incident. Intermittent faults left alone tend to get patched over and over by whoever's available, which usually costs more in total than one proper fault-finding visit that actually finds the cause.
How the job runs
01
We confirm what the report needs to cover, the extent of sampling, access requirements and how long we'll need on site, so there are no surprises on the day.
02
Board, earthing, bonding, accessories and visible cabling inspected for damage, deterioration, unsuitable modifications and non-compliance before any testing begins.
03
Continuity, insulation resistance, polarity, earth fault loop impedance and RCD operation measured and recorded circuit by circuit against expected values.
04
Every observation coded C1, C2, C3 or FI, with the overall outcome stated and each item described so you can see what was found and where.
05
We talk you through the findings, quote separately for any remedial work, and re-test and re-certify once it's completed.
What you actually get
Measured results across every circuit tell you the actual state of the installation instead of an assumption based on the age of the board.
Findings are split into urgent, remedial and advisory, so you can budget sensibly instead of treating the whole list as one emergency.
A compliant report and certificate to provide to tenants, agents and the local authority, with remedial work and re-testing available from the same contractor.
We isolate the installation step by step until we've found the actual cause of an intermittent trip.
RCD trip times and earth loop impedance are measured directly, confirming the safety devices will actually operate when a fault occurs.
NAPIT Full Scope registration, £10m public liability, £10m employers' liability and £1m professional indemnity behind every report.
In detail
Testing is a defined procedure with defined outputs. Knowing what's covered, and what isn't, helps you book the right inspection and make sense of the results afterwards.
The report examines the fixed installation: the supply arrangement, the consumer unit, protective devices, earthing and bonding, and every circuit, with accessories inspected on a sampling basis agreed at the outset.
The coding is the part clients most often misread. An Unsatisfactory outcome is driven by C1, C2 or FI items; C3 items are recommendations and don't by themselves make a report unsatisfactory.
Rented residential property in England requires a satisfactory EICR at intervals of no more than five years, with copies to tenants and the local authority on request. Commercial premises follow inspection intervals appropriate to the environment and use.
Fault finding is diagnostic work. Intermittent faults are isolated by dividing the installation and testing systematically until the cause is proved.
Before you enquire
It depends on the size of the installation and the number of circuits, so we quote per property instead of publishing a headline price. Tell us the property size and circuit count and we'll give you a firm figure.
A typical domestic property usually takes a few hours, depending on circuit count and access to the board and accessories. Larger and commercial installations take proportionally longer and are scheduled around your operating hours.
Rented residential property in England requires an EICR at least every five years. For owner-occupied homes, around ten years is the general recommendation, and commercial premises depend on the environment and usage.
Circuits are isolated one at a time for dead testing, so there are only short interruptions. Tell us in advance about anything that must not lose power and we'll plan around it.
We explain each C1, C2 and FI item, quote separately for the remedial work, and re-test and re-certify once it's complete. You're free to have the remedial work carried out by someone else if you prefer.
No. An EICR covers the fixed installation. Portable appliances are covered by PAT testing, which we carry out separately and can schedule at the same visit.
Yes. Intermittent tripping is one of the most common call-outs. We isolate the installation systematically to prove the cause.
It's available on request. We don't sell it as a standard guaranteed service, but call us and we'll tell you plainly what we can do.
Qualifying installation work carries a 6-year NAPIT-backed workmanship guarantee, with a minimum one year on other work.
Derby, Duffield, Belper, Ilkeston, Long Eaton, Ripley, Ashbourne, Matlock, Burton upon Trent, Nottingham, Chesterfield, Sheffield and the surrounding East Midlands.
Related services
Where we work
Derby · Nottingham · Duffield · Belper · Burton upon Trent · Sheffield · Ilkeston · Long Eaton and the wider East Midlands. See areas covered, read more about the company or return to the homepage.
Book an inspection and you'll get measured results, clearly coded findings, and a straight conversation about what needs doing first.
NAPIT Full Scope · Official Loxone Partner · 6-year workmanship guarantee on qualifying installations · £10m public liability