R Electrical Solutions Ltd logo
Fox ESS home battery storage unit with isolators and armoured cabling installed on a brick wall

Derby · Generation and storage · MCS in progress

Solar PV And BatteryStorage In Derby, DesignedWith The Whole System

Generation and storage planned alongside your consumer unit, EV charging, heating and automation, so the energy you produce gets used where it's worth most instead of exported at the lowest price.

MCS accreditation currently in progress · NAPIT Full Scope registered · Free initial consultation and honest advice on timing

  • 16+ years

    Domestic, commercial and industrial experience

  • Full Scope

    NAPIT registered for all aspects of electrical work

  • 6-year

    NAPIT-backed workmanship guarantee on qualifying installs

  • £10m

    Public and employers' liability cover

  • Free

    Initial consultation, no obligation

The service

Generation is the easy part; using it well is the engineering

Solar PV converts daylight into electricity your property uses first and exports second. Battery storage holds what you don't use and releases it in the evening, or charges overnight on a cheap tariff to cover the expensive part of the day. Both are easy to install. Both are also easy to under-use if nothing coordinates them with the rest of the building.

That coordination is where an automation-led contractor changes the outcome. When the control system knows what's being generated, it can start the immersion, the washing machine or the EV charger on surplus, hold the battery for the evening peak, and shift heating into the sunniest part of the day. Without that, surplus goes to export at a fraction of what it would save you on site.

We'll be upfront about where we stand: our MCS accreditation is currently in progress. That affects eligibility for certain grant and export schemes, so we'll tell you where things stand when you enquire and what it means for your timing.

Who this is for

  • Homes already planning a rewire, extension or automation project where PV can be built in
  • Properties with an EV, a heat pump or high daytime use that can self-consume generation
  • Owners who want storage to shift usage onto cheaper overnight tariffs
  • Commercial premises with daytime load profiles that match generation well
  • Clients wanting generation monitored by the same system as heating and lighting

What it costs to leave it

Exporting your generation at the worst possible value, every sunny day

The common disappointment with solar isn't the panels. It's the self-consumption rate. A household out at work all day generates most of its electricity when nobody's home, exports it, then buys it back at a much higher price at six in the evening. The system works exactly as installed. It was simply never set up to time anything.

Batteries can repeat the mistake at greater expense. A battery configured only to charge from surplus and discharge on demand ignores the tariff entirely. On a time-of-use tariff, charging overnight when it's cheap and covering the evening peak from storage is often worth more than the surplus it would otherwise capture. But the system needs to know what the tariff is doing.

Then there's the infrastructure question that turns up too late. A consumer unit with no spare ways, or an earthing arrangement that needs attention, turns a simple installation into extra work. When PV, battery, EV charging and a heat pump are all likely within a few years, the board should be planned for all of them at once.

Mistakes we get called out to fix

  • Installing generation with no plan for when high-consumption appliances actually run
  • Sizing an array to fit the roof without checking the property's consumption pattern
  • Fitting a battery with no tariff-aware charging strategy
  • Ignoring shading from chimneys, trees and dormers at design stage
  • A consumer unit with no spare capacity for generation, storage and EV together
  • Monitoring that shows totals but never triggers anything to use the surplus

How the job runs

A fixed sequence, so nothing gets decided on the fly

  1. 01

    Free consultation

    We look at the roof, the consumption pattern, the existing board and what else is planned, then give a straight view of what's worth doing and when.

  2. 02

    Design

    Array layout and orientation, inverter and battery sizing against real usage, protection, cable routes and the self-consumption strategy.

  3. 03

    Electrical preparation

    Board capacity, spare ways, earthing and bonding, isolators and metering positions all prepared so the installation has the infrastructure it needs.

  4. 04

    Install and connect

    Array, inverter, battery, protection and monitoring installed, with generation and consumption metering fed into your control system.

  5. 05

    Commission and optimise

    System tested and certified, monitoring verified, and automation rules set so hot water, EV charging and appliances follow the available surplus.

What you actually get

Measurable outcomes, not adjectives

More of what you generate, used on site

Automation starts immersion heating, EV charging and appliances when surplus is available, so generation offsets purchases instead of being exported cheaply.

Storage that follows the tariff

Batteries charged overnight on cheap rates and discharged through the evening peak on a planned schedule.

One board, one plan

We design generation, storage, EV charging and heating against the same consumer unit and earthing arrangement, so nothing gets reworked later.

Visibility that means something

Generation, consumption and battery state shown alongside heating and lighting, with the data put to work triggering actions.

Honest advice about timing

MCS accreditation is in progress and we'll tell you plainly where that stands and how it affects scheme eligibility for your project.

Certified electrical work

The electrical installation is carried out and certified under NAPIT Full Scope registration, with £10m public liability cover behind it.

In detail

Arrays, inverters, storage and integration with the rest of the building

A generation system's value depends on sizing, shading, protection and control. Here's what we assess for properties across Derby, Derbyshire and the East Midlands.

Array design and siting

Roof area is a constraint, not a target. We size the array against consumption, orientation and shading, because panels generating into low-value export add far less than the headline capacity suggests.

  • Roof orientation, pitch and available area assessed against realistic yield
  • Shading from chimneys, dormers, trees and neighbouring buildings evaluated
  • In-roof and on-roof mounting with correct weatherproofing
  • Optimisers or module-level electronics where partial shading is unavoidable
  • Ground-mounted and outbuilding arrays where roof space is limited
  • Array sized to consumption and future load
Inverters, batteries and protection

Sizing the storage matters more than maximising it. A battery larger than your evening consumption spends most of its life partially used, which is capital doing little.

  • String and hybrid inverters selected against array and storage requirements
  • Battery capacity sized to actual evening and overnight consumption
  • AC and DC isolation and protection installed to standard
  • Consumer unit capacity, spare ways, earthing and bonding verified and corrected
  • Generation and consumption metering positioned to feed the control system
  • Surge protection where sensitive electronics share the installation
Integration and self-consumption

This is where an automation contractor adds something a panel-only installer can't. Every controllable load becomes a way to use generation on site.

  • Immersion and hot water diversion driven by measured surplus
  • EV charging scheduled to surplus generation or cheap overnight windows
  • Heat pump and underfloor recovery shifted into peak generation hours
  • Appliance and pool or hot tub circuits triggered on available surplus
  • Battery charge and discharge strategy aligned to a time-of-use tariff
  • Generation, storage and consumption displayed alongside heating and lighting
Residential versus commercial

Commercial daytime load profiles often suit solar better than domestic ones, since generation and consumption coincide naturally without load shifting.

  • Residential: self-consumption maximised through automation and storage
  • Commercial: daytime load profile often matched directly by generation
  • Roof structure, access and maintenance provision assessed before design
  • Metering and reporting suitable for energy management obligations
  • Phased installation planned around trading hours with RAMS on request

Before you enquire

Solar PV & battery questions, answered straight

How much does solar PV and battery storage cost?

It depends on array size, roof type, inverter and battery capacity and the state of the existing board, so we don't publish prices. The initial consultation is free and a written quote follows the design stage.

Are you MCS accredited?

MCS accreditation is currently in progress. Because that affects eligibility for certain schemes, we'll tell you exactly where it stands when you enquire and what it means for your timing.

How long does installation take?

A typical domestic array with a battery is usually a few days on site once the design is agreed and any board work is done. Commercial installations are programmed around your operating hours.

Do I need a battery as well as panels?

Not necessarily. If your consumption is mostly daylight hours, generation may be well used without storage. A battery pays off most where evening consumption is high or a time-of-use tariff rewards overnight charging.

Will it work with an EV charger and a heat pump?

Yes, and designing them together is the whole point. Charging and heating can be scheduled to surplus generation or cheap tariff windows, with the consumer unit sized for all of it at once.

How long do panels and batteries last?

Panels are long-life items with output declining slowly over decades. Inverters and batteries have shorter service lives and are replaceable, and we design the installation so replacing them later is straightforward.

What maintenance does a system need?

Very little routinely, but monitoring should be watched. A string or optimiser fault can cut output for months without anything obvious happening. Maintenance packages include remote monitoring checks.

Can you upgrade an existing solar installation?

Often, yes. Adding storage, improving monitoring, or integrating an existing array into an automation system to raise self-consumption without touching the panels.

What guarantee applies?

Qualifying installation work carries a 6-year NAPIT-backed workmanship guarantee, with a minimum one-year guarantee on other work. Equipment carries its own manufacturer warranties.

Which areas do you cover?

Derby, Duffield, Belper, Ilkeston, Long Eaton, Ripley, Ashbourne, Matlock, Burton upon Trent, Nottingham, Chesterfield, Sheffield and the surrounding East Midlands.

Related services

Where we work

Derby · Nottingham · Duffield · Belper · Burton upon Trent · Sheffield · Ilkeston · Long Eaton and the wider East Midlands. See areas covered, read more about the company or return to the homepage.

Exterior building signage illuminated with colour-changing LED lighting installed by R Electrical Solutions

Design the energy system before you buy the panels

Book a free consultation and we'll tell you honestly what your roof and consumption pattern justify, where MCS accreditation stands, and how it fits with EV and heating plans.

NAPIT Full Scope · Official Loxone Partner · 6-year workmanship guarantee on qualifying installations · £10m public liability

Call NowGet an Estimate